This floating solar photovoltaic (FPV) project is located in Chiang Rai, Thailand, and represents an innovative approach to utilizing water surfaces for renewable energy generation. The project has an installed capacity of approximately 1MWp and adopts 700Wp high-efficiency photovoltaic modules with a 5° installation tilt angle.
The floating PV system uses a modular floating platform and rod-connection structure, enabling efficient deployment on the water surface while maintaining structural stability and operational reliability.
Foner Solar provided engineering design, structural component supply, and on-site technical support for the project. The system was successfully completed and commissioned in December 2024 and has been operating smoothly since then.
This floating solar photovoltaic project is located in Kenya, Africa, utilizing local water resources to generate clean and sustainable energy.
The project has an installed capacity of approximately 138 kWp and uses 660Wp photovoltaic modules installed at a 10° tilt angle.
The PV modules are mounted on a floating platform with rod-connection structure, providing excellent structural stability and adaptability to water environments.
Foner Solar provided engineering design, structural component supply, and installation guidance services for the project. The system was successfully completed and commissioned in September 2024, and it has been operating reliably since then.
This floating solar photovoltaic (FPV) project is located in Buriram, Thailand, utilizing local water resources to generate clean renewable energy. The project has an installed capacity of approximately 1MWp and uses 550Wp high-efficiency photovoltaic modules installed at a 5° tilt angle.
The system adopts a floating platform and rod-connection structure, providing excellent structural stability while maximizing water surface utilization.
Foner Solar provided engineering design, structural component supply, and on-site installation guidance for the project. The floating solar system was successfully completed and commissioned in April 2025, and it has been operating reliably since then.